kronos: making carbon capture profitable on an aging gas field
Indonesia wants to raise natural gas output to 12 BSCFD by 2030 while working toward Net Zero emissions by 2060. Aging gas blocks with high CO2 levels make both goals hard to meet at the same time. KRONOS Intelligence, built for the PRIME 2026 Business Case Competition, is our engineering and financial proposal to make one of those fields, Blok Alpha, profitable again.
the blok alpha problem
Blok Alpha starts from a difficult baseline:
- production drops by about 10% per year.
- raw gas contains 40% CO2 along with corrosive H2S, which wears down pipe walls and raises leak risk.
- older surface equipment pushes operating costs up to USD 5.5/BOE, cutting into margins every year.
If nothing changes, the high impurity levels make the field unsafe to operate and too costly to keep open.
reusing captured co2
KRONOS uses MDEA amine separation to strip out the 40% CO2 stream, then pairs closed-loop Carbon Capture, Utilization, and Storage (CCUS) with Enhanced Gas Recovery (EGR).
We picked MDEA over membrane separation for three practical reasons. First, MDEA uses less energy when CO2 levels stay above 20%. Second, membranes lose performance as inlet pressure falls along a 10% yearly decline. Third, Pertamina already has hands-on experience running MDEA units at Jatibarang and Sukowati.
Once separated and compressed, the CO2 is pumped back into the reservoir to maintain underground pressure. That lifts gas recovery by an estimated 5% to 10% and keeps the carbon stored underground.
digital monitoring with human control
Capture plants are expensive to run when operators have poor visibility into aging pipes. KRONOS adds four digital tools on top of the existing brownfield setup, so the field can modernize without shutting down:
- iiot sensors: real-time sensors monitor corrosion, pressure, and temperature along older pipelines.
- physics-informed digital twin: a live model runs LSTM (to catch slow pressure drift) and Isolation Forest (to spot multi-sensor faults). Thermodynamic and fluid-mechanics rules bound the model so predictions stay physically realistic within a
< 5%error target. - advisory alerts: following ANSI/ISA-18.2 alarm standards with 60-second alert delivery, KRONOS recommends steps like lowering compressor pressure above 90% MAOP. Human engineers still approve and make every physical change.
- off-grid solar power: a 300 kW-peak solar array and 200 kWh battery bank power the sensors and Digital Command Center independently. Monitoring stays online during grid outages, and Scope 2 emissions stay at zero.
why the financials work
Many CCUS projects stall when they rely on subsidies and only add compliance costs without bringing in revenue. KRONOS spreads USD 720 million of CAPEX over three years (40-40-20) and cuts OPEX by about 31% to USD 3.8/BOE (USD 22M/year at steady operation). The project brings in money from four sources:
| revenue source | annual estimate | details |
|---|---|---|
| baseline commercial gas | usd 105m | 48 mmscfd at usd 6/mmbtu |
| enhanced gas recovery | usd 10m | +10% gross recovery lift |
| carbon credits (idxcarbon) | usd 9m | ~0.6 mtco2/yr at usd 15/t |
| third-party storage jv | usd 9m | ~0.6 mtco2/yr storage fee |
Over a 20-year operating period at a 10% discount rate, the project generates USD 133 million/year in revenue, an NPV of +USD 112 million, an IRR of 12.1% (above the 12% target), and a 6.5-year operational payback period. Even if domestic gas prices drop to USD 5.0/MMBTU, the extra revenue streams keep NPV positive at +USD 3 million.
Every ton of captured CO2 goes through Indonesia’s MRV legal process: digital twin cross-checks, independent VVB audits, KLHK SRN PIK registration, and SPE-GRK issuance. In total, the field stores about 1.2 MtCO2 per year, roughly equal to taking 260,000 passenger cars off the road each year.
handling operational and market risk
We did not assume the AI models would be accurate on day one or that carbon credit demand would always be strong. For the first 18 months, KRONOS runs in conservative advisory mode and gets checked weekly against manual inspections, targeting at least 80% accuracy by month 12 and 92% by month 24. On the commercial side, IDXCarbon sales run alongside bilateral international storage contracts and minimum gas price clauses, so a slow domestic carbon market will not sink the project.
using the same approach elsewhere
Blok Alpha has the same issues as many other mature gas fields in Indonesia. Combining brownfield MDEA-EGR with off-grid monitoring gives operators a practical setup they can reuse across other aging blocks to keep pipes safe, cut running costs, and record verified carbon storage.